Installing cover and cover rails, Ab d c – ShelterLogic 70641 GrowIt Organic Growers Greenhouse 6 x 8 x 6 6 User Manual

Page 7

Advertising
background image

05_70641_B1

Page 7

= Bungee fastener locations

6. insTAllinG coVeR And coVeR RAils

A. Your greenhouse cover comes in one complete piece. You may find it easier to fit the cover over the frame by

partially opening the door zippers.

B. Pull cover over the frame, making sure to center cover on frame. There should be an equal amount of

overhang at all four corners.

C. Inside the greenhouse, place a bungee cord fastener through each grommet hole and loop around the pipe of

the roof frame. Secure elastic around ball.

D. Disassemble cover rails and slide them through the fabric pockets at each leg. Reattach with clamps to each

leg. Repeat this on other side. Push down on cover rails to tighten cover, before tightening bolts completely.

E. Check and tighten Cover Rails monthly to ensure the cover is tight.

A

B

d

c

Inside view of Cover

10115

802695

13202

802864

01011

07000

10115

802695

802695

13201

802864

07000

01011

Middle Rib Cross Rail Clamps

End Rib Cross Rail Clamps

Advertising