AST AST46DS Operating Instructions User Manual

Page 2

Advertising
background image

TM

TM

www.astsensors.com (973) 448-1901

www.astsensors.com (973) 448-1901

PROCESS CONNECTION INSTALLATION
The standard process connection for the AST46DS is ½” NPT male. Use the

7/8” hex above the thread of the process connection to install into the process.

Do not use the body / housing for installation.

ELECTRICAL INSTALLATION

WARNING

: EXPLOSION HAZARD

Do not disconnect equipment unless power has been switched off or the area

is known to be non-hazardous. This equipment must be powered by a Non-

hazardous live source in accordance with CAN/CSA-C22.2 No. 61010-1-04 eg.

limited energy source, or a Class 2 Source.

Please review the following wiring instructions. For U.S. installations, product

case ground screw on the interior or exterior of the housing must be bonded to

ground according to Article 501 & 505 of the NEC.

Recommended Wire Gauge: 18-22 AWG

Remove rear cover by hand to access terminal blocks.

•

Run wire through either conduit connection and feed toward the terminal blocks.

•
Conduit should be installed over wire / cable per electrical code requirements.

Use a Philips Head screw driver to loosen terminal screws.

•

Connect wires to the proper terminal according to chart and tighten screw.

•

Ensure either the internal or exterier case ground screw is

•

bonded to ground

according to Article 501 & 505 of the NEC.

Install conduit plug if one side of electrical connection is unused.

•

Close Cover.

•

WIRING INFORMATION

Output Type

Pin 1

Pin 2

Pin 3

Electrical Power

Requirement

1-5V

+V

-V

Signal Output

8-28VDC

4-20mA

+Signal

- Signal

Not Connected

8-28VDC

PIN 1

PIN 2

PIN 1

PIN 2

PIN 3

7/8’’ Hex

1/2’’ NPT Male

FIELD SERVICE

The AST46DS has no field serviceable parts. For technical issues or questions,

please contact the factory:

[email protected]

1/2” NPTF

1/2” NPTF

6.535

4.134

1.556

3.543

4.173

1.575

case ground screw

TERMINAL BLOCK OUTLINE

Advertising