Operational instructions 1. operational procedures, Gut-6000a user manual – GW Instek GUT-6000A User Manual

Page 8

Advertising
background image

GUT-6000A USER MANUAL

8

OPERATIONAL INSTRUCTIONS

1. OPERATIONAL PROCEDURES

STEP1. Plug in AC power cord, then switch power on.

The black light of LCD is on and presents software version.
It starts self-test.

STEP2. Auto search the IC number and test if an IC is on the socket.

STEP3. Use TTL/CMOS to switch the selection of ''TTL74'', ''CMOS40'' or

''CMOS45'' series ICs.

No system error found displays on the LCD

System error shows on the LCD if it is detected.

Advertising