HT instruments HT950N User Manual

Page 8

Advertising
background image

HT950N

EN - 8

5. OPERATIVE INSTRUCTIONS

5.1. INSTALLATION
For HT950N practice installation please consider the following specifications:

 Installation

zone

must

to

be dust and corrosive gas free.

 HT950N meter must to be installed:

 Far from direct solar light and impact warm sources;
 Far from MV devices (big meter counter, energy cables, SCR or TRIAC apparatus,

radiotransmitter).

 You must prepare a square hole on 36.8 x 36.8 inch (height x width).

 Insert HT950N and fix with standard screws and connectors.

5.2. ELECTRICAL

CONNECTIONS

Please see the following Fig. 3 to execute all electrical connections on HT950N meter.

Fig. 3: electrical connections on HT950N meter

Advertising