Internal contaminants, Hard water conditions, Thermal expansion (closed system) – A.O. Smith VB/VW- 1000 User Manual

Page 23: Remote probe installation procedure

Advertising
background image

23

7. SYSTEM CONTROLLER

Controlling of these systems is decided mainly by the type

of building system controlling desired. A single boiler

installation might be controlled directly from space

temperature thermostat(s). Multiple boiler installations are

more effective when the boilers are sequenced in and out of

operation by some form of main water temperature controller.

With one or two boilers, individual control settings at

progressive temperature may be used. For more than

two boilers, electronic sequencing controlling is

recommended. Individual controls, or the separate stages

of a step controller, should start the boiler loop circulator

and fire the boiler. Some large installations may require the

firing of more than one boiler per stage.

The system or primary circulator may or may not be

controlled by the boiler sequencer. When this pump is

operated through the first switch of any type of step

controller, care should be taken to determine if a motor

starter is needed due to insufficient switch capacity.

Multiple boiler installations are especially adapted to the

use of outdoor reset for main water temperatures. This

feature is not mandatory, but offers smooth, efficient

operation of a modern system.

Normal use of flow control valves is required to prevent

cross circulation of zones as with any multiple pump system.

Large systems with multiple boilers should include main

water temperature controls (with or without outdoor

reset) to sequence the boiler on and off, in relation to

the load on the system.

24VAC System Controller (Optional) - VB models require

a field supplied 24VAC operating control to be installed in

the system such as: loop thermostat, indoor/outdoor reset

control, sequencing panel, or energy management system.

The connection for such devices is located in the junction

box at the rear of the unit. A 24VAC thermostat/aquastat can

only be used as an “On/Off” switch for the unit. The actual

controlling of the phasing will be through either the inlet or

remote probe. To use a 24VAC system controller, dipswitch

“4” on the MCB must be switched to the “on” position, see

REMOTE PROBE INSTALLATION.

INTERNAL CONTAMINANTS

The hydronic system must be internally cleaned and flushed

after a new or replacement boiler has been installed, to

remove contaminants that may have accumulated during

installation. This is extremely important when a replacement

boiler is installed into an existing system where Stop Leak

or other boiler additives have been used.

Failure to clean and flush the system can produce acid

concentrations that become corrosive, and leads to heat

exchanger failure.

All hot water heating systems should be completely flushed

with a grease removing solution to assure trouble-free opera-

tion. Pipe joint compounds, soldering paste, grease on tubing

and pipe all tend to contaminate a system

Failure to flush contaminants from a system can cause solids

to form on the inside of boiler exchangers, create excessive

blockage of water circulation, deterioration of the pumps seal

and impellers.

HOT WATER SUPPLY BOILER SYSTEM - GENERAL

WATER LINE CONNECTIONS

This section provides detailed installation diagrams for a

typical method of application for the unit.

Piping diagrams will serve to provide the installer with

a reference for the materials and methods of piping

necessary for installation. It is essential that all water

piping be installed and connected as shown on the

diagrams. Check the diagrams to be used thoroughly

before starting installation to avoid possible errors and to

minimize time and material cost.

It is essential that all water piping be installed and

connected as shown on the diagrams. Check the diagrams

to be used thoroughly before starting installation to avoid

possible errors and to minimize the time and material cost.

HARD WATER CONDITIONS

Where hard water conditions exist, water softening or the

threshold type of water treatment is recommended. This

will protect the dishwashers, coffee urns, water heaters,

water piping and other equipment. When water softening

or water treatment is not practical, a comparatively easy

method of periodic lime removal from the unit may be

employed.

SHUTOFF VALVES SHOULD BE INSTALLED FOR

SERVICING BOILER, HOWEVER, LOCAL CODES SHALL

GOVERN THEIR USAGE.

THERMAL EXPANSION (CLOSED SYSTEM)

As water is heated, it expands (thermal expansion). In

a closed system the volume of water will grow when it is

heated. As the volume of water grows there will be a

corresponding increase in water pressure due to thermal

expansion. Thermal expansion can cause premature tank

failure (leakage). This type of failure is not covered under

the limited warranty. Thermal expansion can also cause

intermittent Temperature-Pressure Relief Valve operation:

water discharged from the valve due to excessive pressure

build up. This condition is not covered under the limited

warranty. The Temperature-Pressure Relief Valve is not

intended for the constant relief of thermal expansion.

A properly sized thermal expansion tank must be installed on

all closed systems to control the harmful effects of thermal

expansion. Contact a local plumbing service agency to have

a thermal expansion tank installed.

REMOTE PROBE INSTALLATION PROCEDURE

A remote probe is supplied with each hot water supply

boiler (VW models). To connect the remote probe to the

boiler, remove the cover from the junction box at the rear

of the unit. Connect the probe wire pigtails, see Figure 7.

Check the field connection diagram located on this cover

of the junction box to assure proper wiring.

Once the remote probe has been connected to the boiler, it

must be designated as the controlling probe for the system.

Advertising
This manual is related to the following products: