Installation & operation – Revo RCDY12&24-1 (12LED 24LED) User Manual

Page 4

Advertising
background image

3

5. Installation & Operation

1. Install Preparation

Drill hole in wall if wire needs to go through the wall.




















2. Removing the Dome Cover

Remove the dome cover from the main body by gently turning the
cover counter-clockwise to unlock and pull free from the main body.










Note!

The following picture illustrates the
base of the real IR Dome. The IR
Dome does not provide a central
pathway for the cables to run through
as it applies RJ12 connection
method.

Therefore, you must drill

hole in wall to be off center of base ,
in either zone

“A” , “B” or “C”.


Advertising