Chapter 2, Installing the hardware, Chapter 2: installing the hardware – Allied Telesis Layer 3 Gigabit Ethernet Switch x600-24Ts/XP User Manual

Page 35

Advertising
background image

35

Chapter 2

Installing the Hardware

This chapter provides procedures to install an x600 switch. The chapter
contains the following sections:

ˆ

“Reviewing Safety Precautions” on page 36

ˆ

“Unpacking a Switch” on page 38

ˆ

“Installing the Power Cord Retaining Clip” on page 39

ˆ

“Installing the Switches in an Equipment Rack” on page 40

ˆ

“Resetting the Switch” on page 42

Advertising