Installation, Front view rear view – Techne 3PrimeG User Manual

Page 18

Advertising
background image

17

INSTALLATION


See also the Safety Information sections on pages 5 to 14.

Front view

Rear view


1. Lid adjustment knob (

3

PrimeX and G only).

2. Lid release latch.

3. 3.5” colour VGA LCD touch screen display.

4. USB port for memory stick.

1. USB port for service and calibration only.

2. On/Off rocker switch.

3. Mains cable inlet.

Installation

1. Place the unit on a suitable flat bench, ensuring that

the air inlet vents on the sides are free from

obstruction.

2. Plug the mains cable into the socket on the back of

the instrument.

3. Connect to the mains electricity supply with the plug

provided or one wired correctly for the supply. Switch

the power ON using the switch located on the rear of

the unit. The front display will then light up.

4. Release the heated lid by lifting the latch forward and

use it to lift the lid. To close the lid, lower the lid onto

the block and press the latch to secure in place.

5. Place the samples in the block. If individual tubes or

strip tubes are being used, space these out evenly

across the block to equalise the pressure from the

heated lid.

Advertising
This manual is related to the following products: