1 tractor pre-operation inspection/service, 2 boom unit pre-operation inspection and service, Operation – Alamo RHINO 1900 User Manual

Page 122: Opera t ion

Advertising
background image

OPERATION

1900 07/11

Operation Section 4-12

© 2011 Alamo Group Inc.

OPERA

T

ION

6.2 Boom Unit Pre-Operation Inspection and Service

Inspect and service the boom arm and head prior to operation. Damaged and/or broken parts should be

repaired and/or replaced immediately. To ensure the unit is ready for operation, conduct the following:
OPS-B- 0020

Periodically inspect all moving parts for wear and replace when

necessary with authorized service parts. Look for loose fasteners, worn

or broken parts, and leaky or loose fittings. Make sure all pins have

cotter pins and washers. Serious injury may occur from not maintaining

this machine in good working order.

(SG-21)

6.1 Tractor Pre-Operation Inspection/Service

Refer to the tractor operator’s manual to ensure a

complete pre-operation inspection and scheduled

service is performed according to the

manufacturers recommendations. The following

are some of the items that require daily service and

inspection:
•

Tire condition/air pressure

•

Wheel lug bolts

•

Steering linkage

•

PTO shield

•

SMV sign is clean and visible

•

Tractor’s lights are clean and functional

•

Tractor Seat belt is in good condition

•

Tractor ROPS is in good condition

•

ROPS is in the raised position

•

No tractor oil leaks

•

Radiator free of debris

•

Engine oil level and condition

•

Engine coolant level and condition

•

Power brake fluid level

•

Power steering fluid level

•

Fuel condition and level

•

Sufficient lubrication at all lube points

•

Air filter condition OPS-U-0030

Advertising