INSTALLATION

Pre-Plan your installation. You need to accomplish the following:

▪

Meet all National and Local codes (NEC

®

Article 285 and UL 1449 address SPDs).

▪

Confirm System voltage to SPD voltage (120V SPD will fail instantly on 240V, 277V, etc.).

▪

Mount SPD as close to panel or equipment as possible to keep leads short. (long leads hurt performance).

▪

Ensure leads are as short and straight as possible, including neutral and ground. If using a

breaker, use a breaker position that is close to the SPD and the panel’s neutral and ground.

▪

If using a breaker, recommended breaker size is 30A due to 10 AWG conductor.

▪

Make sure system is grounded per NEC

®

and clear of faults before energizing SPD.

(inadvertent system problem may fail SPD).

▪

Never Hi-Pot test Any SPD. (will prematurely fail SPD).

▪

Do not install the XCS through the bottom of a NEMA 3R panel. Dripping water will

prematurely fail the SPD.

1. Use voltmeter to check voltages and ensure correct SPD. See Data Sheet for specs and wire-outs.

2. Determine Mounting location – weather resistant equipment may be required.

3. If SPD has optional Dry Contact Flush Mount Kit, or Remote Indicator, pre-plan their installation. See

Figure 3. (If flush mounting, be careful to not drop SPD into wall).

4. Remove power from panel/source. Confirm panel/source is deenergized.

5. Identify breaker location and SPD location. Position SPD such that LEDs are best visible.

6. Mount SPD – weather resistant applications require additional sealing, etc. (not included)

- Remove an appropriately sized knockout from panel.
- Connect conductors as appropriate – short and straight as possible (Hi-Legs are Phase B).

- Note that the metallic connection hub is not grounded within the SPD and proper grounding

requires connection of the green conductor ground.

7. Label or mark conductors as appropriate (neutral: white, ground: green, energized: black, hi-leg: orange).

8. Make sure system is bonded per NEC

®

and is clear of hazards or faults before energizing

(N-G bonding not per NEC

®

will fail SPDs: #1 cause of SPD failures).

9. Energize and confirm proper operation of green LED indicators and/or options.

2

Figure 2

A

B

C

G

N

BREAKER

Figure 1

(Type 1 or individual equipment installations may vary)

▪

Use closest breaker

to SPD

▪

Locate SPD close to

intended breaker

▪

Keep Leads Short

as Possible

▪

Avoid Sharp Bends

▪

Rotate XCS such

that LED indicator is

most visible

▪

Outdoor installation requires appropriate weather

sealing at nipple (gasket, sealing conduit, etc.)

To Protected Loads

LEADS SHORT & STRAIGHT

Cut off

Excess

Length

Do Not

Loop or

Coil

Short and

Straight

Figure 3

Phase, Ground,

and Neutral Wires

SPD

Mounting

Screws

(4 places, through mountingplate into

mounting surface, screws not provided)

Flush Mount

Kit Screws

(8-32 x 5/8” Thread Cutting, 4

places, through plate into SPD)

Mounting Surface

Removed Material

Flush Mount Plate

Insert flushmount screw
through hole in each
corner or punch a small
starting hole in center of
each translucent window
(located in all 4 corners
of the label).

VERIFY THAT ALL POWER CIRCUITS ARE

DEENERGIZED BEFORE MAKING CONNECTIONS

All electrical connections should be performed by a qualified (licensed)

electrician or technician. All wiring must comply with the National

Electrical Code (NEC

®

) and applicable local codes.

V

WARNING

▪

Confirm XO N-G Bonding at Upstream Transformer

▪

Do Not Hi-Pot Test

▪

Resulting Damage is not Covered Under Warranty

TYPICAL PANEL

INSTALLATION

X

NOT

GOOD

GOOD

V

WARNING