Installation complete, Installation complete 22 – Badger Meter ORION AMR/AMI Hardware Solutions for Gas Utilities User Manual

Page 22

Advertising
background image

To program the ORION remote endpoint, place the IR cable so the optic read head aligns with the LED output port

INSTALLATION COMPLETE

Installation of the ORION remote endpoint is now complete

LED Output

Port

Optic Read

Head

ORION® Gas Endpoints, Remote Endpoint for Gas Meters and Volume Correctors with Pulsed Outputs

Page 22

July 2013

Advertising
This manual is related to the following products: