Prochem Apache Air Mover User Manual

Page 10

Advertising
background image

10

Operation & Maintenance

OPERATION

On-Off Procedure

1. Open the doors or windows if possible to aid in

ventilation.

2. Ensure that the unit is turned off, plug the power

cord into the outlet.

3. Turn the switch ON.

4. Turn the unit off before un-plugging the power

cord from the outlet.

MAINTENANCE

1. Frequently inspect power cord for frayed or

damaged insulation.

Remove machine power cord from electrical
source before making any repairs or adjustments
to machine.

Retirez le cordon d'alimentation de la machine de
la source électrique avant de procéder à des
réparations ou des ajustements de la machine.

Power Cord/switch

Power cord and switch can be serviced.

1. Remove the 4 screws securing switch plate.

2. To replace switch unplug wires and replace

switch. See wiring diagram.

3. To replace power cord see step 1.

4. Unplug wires, loosen strain relief and remove

cord.

5. Replace power cord. See wiring diagram.

When reinstalling motor and fan, make sure the wires
are positioned and secured so they will not touch fan
during rotation.

Lors de la réinstallation du moteur et du ventilateur,
vérifiez que les câbles sont positionnés et fixés de
manière à ne pas toucher le ventilateur pendant la
rotation.

When reinstalling electrical parts, refer to wiring
diagram for correct connections

Lors de la réinstallation des pièces électriques,
référez-vous au schéma de câblage pour des
connexions appropriées.

86362950 Apache AM

Advertising