Chapter 3: Installation

9 of 17

Chapter 3: Installation

3-1 Work

Rules

The installation, operation, and maintenance of this equipment must be conducted in
accordance with applicable work and safety codes for the installation location. This may
include, but is not limited to, OSHA, NEC, CSA, and any other local, national, and
international regulations.

• Read and follow these operating instructions when installing, operating, and

maintaining this equipment. If the instructions become damaged or unreadable,
additional copies are available from the manufacturer.

• Only qualified personnel familiar with this equipment should work on or with this

dryer.

• Work with approved tools and devices

Caution!

Disconnect the electricity before maintenance or service!

• If the dryer is installed with a power cord that can be unplugged, unplug it. If the

dryer is permanently wired to a main power, a fused power disconnect must be
installed to allow the disconnect to be locked in the OFF position. Open and lock the
disconnect installed in the control enclosure. It is advisable to remove the disconnect
fuses and carry them with you.

3-2 Installation Location Considerations

Your hot air dryer was designed to be mounted near the processing machine and connected to
the drying hopper with the high temperature, flexible hose provided with the unit.

Note: Make sure to allow enough dryer hose to compensate for any movement of the

drying hopper.

Hose Connection

a. Remove the shipping cap from the air heater can outlet.

b. Connect one end of the dryer hose to the outlet with a hose clamp.

c. Attach the other end of the hose to the inlet of the drying hipper and secure with a hose

clamp.

3-3 Assembling the Air Diffuser/Air Trap

On existing machine hoppers, it may be possible to install the optional air diffuser assembly
if the machine hopper is the proper size. The hopper must be round and have sufficient
capacity for the proper material residence time. Consult factory for drying times required on
other materials.

1. Position the air diffuser so that it rests on the support arms of the machine hopper.

2. Adjust the support arms to allow two to four (2 to 4) inches (51 mm to 102 mm) from

the diffuser screen to the hopper wall and keep the space constant around the air
diffuser.

3. Cut the high-temperature flexible hose to suit the hopper depth. Centrally locate the

hose over the hopper discharge throat. Make sure that the screen diffuser does not
get tilted out of position. Secure the hose with the clamps provided.