Installation, Connection – Timeguard NSLDD1000 User Manual

Page 4

Advertising
background image

3

Installation

The unit is suitable for connection to a 230V ac 50Hz

electricity supply. It is suggested that 3-core round flexible

cable of 1sq.mm gauge is used. An internal switch should

be installed to switch the power to the unit ON & OFF. This

allows the sensor to be easily switched off when not

required or for maintenance purposes.

IMPORTANT

Switch off the electricity at the fuse box by removing the

relevant fuse or switching off the circuit breaker before

proceeding with the installation.

Open the unit by gently prying the “ears” on each side of

the unit. See diagram A. This can be done without a tool,

but if you prefer use a flat blade screwdriver, but be

careful not to damage the clips. They should release easily.

The front cover is hinged at the top, the front cover will

swing open upwards.
Using the unit as a template, drill the holes. Insert the wall

plugs into the holes. See diagram B.
It is recommended that the grommet is pierced with a

screwdriver to ensure a better seal.
Fix the unit to its mounting surface. Do not overtighten

the mounting screws as this could damage the unit. If

using a power screwdriver, use the lowest torque setting.
Remove the cable clamp. See diagram C
Pierce and pass the cables through the grommet.

We recommend you use a screwdriver to pierce the

grommet as this will give a better seal.

Connection

Connect the incoming mains cable to the terminal block on

the unit as follows (see connection diagram):
NEUTRAL (Blue)

N

EARTH (Green/Yellow)
LIVE (Brown)

L

Connect the lighting load cable to the terminal block.
NEUTRAL (Blue)

N

EARTH (Green/Yellow)
LIVE (Brown)

L1

Advertising