UEi Test Instruments DMEG3 User Manual

Page 7

Advertising
background image

Preparig Equipment Under Test
Isolation is a key factor in properly testing any insulation resistance
value. Whether you are testing a motor winding, transformer winding or
a cable, you must ensure that the component you are evaluating has no
path to ground or other circuits. Contactors and switches must be open
and terminal connections must be removed prior to testing.

Your insulation resistance tester is designed to place the DC charge on
the “LINE” terminal while the “EARTH” terminal often shares the
grounded contact with all other components.

You can only test one cable, winding or component at a time, but they
ALL need to be tested independently (Fig 4).

When more than one connection is called for, connect the test
points together.

E = Earth L = Line

Single Phase Transformer Connection Sequence Table

Motor Connection Sequence Table

Insulated 3-Conductor Cable Connection Sequence Table

Shielded 3-Conductor Cable Connection Sequence Table

60-Second (spot reading) Method
Spot readings are often used as predictive/preventive maintenance
tools. Readings are generally taken at regular intervals (quarterly,
semi-annually, etc.) and recorded on a chart that stays with the
equipment being tested. To make an analysis of a motor using
this method:

1. Check and record equipment temperature.

2. Check dew point temperature of the ambient air-equipment

under test must be above dew point temperature for
accurate results.

3. Ensure no power is applied to the equipment under test and all

connections are removed in order to totally isolate the motor,
cables or equipment from other circuits. Use the connection
tables to determine where to make connections.

If you are testing a motor, the brushes must be removed
prior to testing

Connect all components that are NOT being tested, including
motor housing, to ground (EARTH)

Test Field and Stator windings independently

4. Turn your instrument power on (DMEG3).

5. Place rotary function select switch to the INSULATION position,

with the correct voltage selected - Use the same voltage
every time.

6. Make connections according to the sequence tables provided or

as your circumstances require.

7. Using a stopwatch or watch with a second hand, begin a

60-second test at the same time you press and hold (or lock)
the “Press to Test” button.

8. At the end of 60-seconds, read and record the insulation

resistance value.

9. Apply temperature correction factor and record results on

PM Chart (Fig 4).

DMEG3/IRT3-MAN

P. 6

(Fig 4)

Sequence

X1

H2

Ground

1

E

L

E

2

L

E

E

3

L

E

4

E

L

Sequence

L1

L2

L3

Shield

1

E

L

E

E

2

L

E

E

E

3

E

E

L

E

4

(Remove Shield

E

E

E

L

from Ground)

Sequence

Stator

Field

Ground

1

E

L

E

2

L

E

E

3

L

E

4

E

L

Sequence

L1

L2

L3

1

E

L

E

2

L

E

E

3

E

E

L

Advertising
This manual is related to the following products: