Canon LV-8235 UST User Manual

Page 23

Advertising
background image

LV-8235 UST Basic Serial Command Specifications

-20-

7.4. Status Read Command

Command “CR0”

[CR]

Detail

Get the projector’s operating status

Response

Acceptable “%1”

[CR]

%1

”00” = Power ON
“80” = Standby
“40” = Countdown in process
“20” = Cooling Down in process
“10” = Power Failure
“28” = Cooling Down in process due to Temperature Anomaly
“88” = Coming back after Temperature Anomaly
“24” = Power Save/Cooling Down in process
“04” = Power Save
“21” = Cooling Down is in process after Power off due to lamp

failure

“81” = Standby after Cooling Down due to lamp failure

Unacceptable

“?”

[CR]

[Details of Response]

“00” [CR]

Status: Power ON

Normal image is on the screen.

“80” [CR]

Status: Standby

When the status is Standby, Status Read Commands are always acceptable, but

Functional Execution Commands are not acceptable except POWER ON Command.

“40” [CR]

Status: Countdown in process

When “Display” in Setting Menu is ON and POWER ON is executed, it starts

Countdown.

When “Display” in Setting Menu is OFF, processing Countdown is not executed and the

status quickly moves to Power ON.

“20” [CR]

Status: Cooling Down in process

When the status is Power ON, and POWER OFF Command (“C01” [CR]) is executed, it

moves to Cooling Down status.

This status automatically moves to Standby after lamp turns off and the fan spin finishes

after about 90 seconds. The fan spin time depends on a model.

This function is used to cool down the lamps and other optical parts and is quite

important for projector’s reliability.

During this time, Functional Execution Commands are invalid.

“10” [CR]

Status: Power Failure

When the power supply voltage inside the projector reaches abnormal status, the

projector is automatically turned off. The projector returns “10” [CR], which shows it

Advertising