Cable management, Preparation – LG 55LH40 User Manual

Page 20

Advertising
background image

PREP

AR
ATION

20

CABLE MANAGEMENT

PREPARATION

Connect the cables as necessary.
To connect additional equipment, see the EXTERNAL EQUIPMENT SETUP section.

For 55LH400C: Secure the power cable with the PROTECTIVE BRACKET and SCREW as shown.
It will help prevent the power cable from being removed by accident.

Install the CABLE MANAGEMENT CLIP as shown.

CABLE MANAGEMENT CLIP

1

2

Put the cables inside the CABLE MANAGEMENT CLIP and snap it closed.

3

For 32/37/42/47/55LH40, 32/37/42/47/55LH41, 37/42/47/55LH55, 55LH400C

Image shown may differ from your TV.

CABLE MANAGEMENT CLIP

PROTECTIVE BRACKET (FOR 55LH400C)

Advertising