Setting up and using the workstation, Setting up the workstation, Location and ventilation – HP Z1 Workstation User Manual
Page 19: 3 setting up and using the workstation

3 Setting up and using the
workstation
Topics
Setting up the workstation on page 11
Installing optional components on page 24
Setting up the workstation
Location and ventilation
Proper ventilation for the system is important for workstation operation. To ensure adequate ventilation:
●
Operate the workstation on a sturdy, level surface.
●
Provide at least:
◦
12 cm (4.7 in) clearance at the front, back, top, and bottom of the workstation
◦
16 cm (6.3 in) clearance on the right side for the optical drive
●
Ensure that the ambient air temperature surrounding the workstation falls within the specified limits
Environmental specifications on page 10
).
●
Never restrict the incoming or outgoing airflow of the workstation by blocking any vents or air
intakes.
Setting up the workstation
11