HP ProLiant ML370 G6 Server User Manual
Page 77
Advertising

Hardware options installation 77
9.
Slide the optical drive into the drive bay.
10.
Route and connect the cables:
a.
Connect the power and data cable to the optical drive.
b.
Connect the power cable to an available system power cable.
c.
Route and connect the data cable to the system board.
11.
Install the fan cage.
12.
Install the air baffle.
13.
If removed, install the BBWC battery pack or the FBWC capacitor pack ("
pack or the FBWC capacitor pack
" on page
14.
Install fan 5.
15.
Install the access panel.
16.
Do one of the following:
o
Close or install the tower bezel, as needed.
o
Slide the server back into the rack.
Advertising
This manual is related to the following products: