Installing a server blade, Er blade, On p – HP ProLiant BL680c G5 Server-Blade User Manual

Page 19

Advertising
background image

Setup 19

Installation is shown in the HP BladeSystem c7000 Enclosure.

Server blade signal Interconnect bay

Interconnect bay labels

NIC 1 (Embedded)

1

NIC 2 (Embedded)

2

NIC 3 (Embedded)

1

NIC 4 (Embedded)

2

Mezzanine 1

3 and 4

Mezzanine 2

5 and 6

7 and 8

Mezzanine 3

7 and 8

5 and 6

For detailed port mapping information, see the HP BladeSystem enclosure quick setup guide or the
HP BladeSystem enclosure setup and installation guide on the HP website

(

http://www.hp.com/go/bladesystem/documentation

).

Installing a server blade

HP BladeSystem enclosures ship with device bay shelves to support half-height devices. To install a full-

height device, remove the device bay shelf and the corresponding blanks.

CAUTION:

To prevent improper cooling and thermal damage, do not operate the server blade

or the enclosure unless all hard drive and device bays are populated with either a component

or a blank.

Installation is shown in the HP BladeSystem c7000 Enclosure.
For detailed information on the c7000 or other BladeSystem enclosures, see the appropriate enclosure

setup guide or server blade user guide.

Advertising