Editing a collector schedule, Editing a, Collector schedule – HP Storage Essentials Enterprise Edition Software User Manual

Page 261

Advertising
background image

HP Storage Essentials SRM 6.0 User Guide 223

NOTE:

If you are using the prstat utility, all of the processes will be named java.exe.

Editing a Collector Schedule

There are several ways to modify a collector schedule:

Locate the collector you want to edit in the collector table, and click the Edit (

) button in that

collector’s row.

Locate the collector you want to edit in the collector table, and select the collector using the

checkbox in the first column of the table. You can select one or more collectors this way. Click

the Edit Selected button above the collector table to modify the selected collector’s schedules at

the same time.

If you want to modify all of the collectors displayed on the same page of the collector table, click

the checkbox in the first column header, and then click the Edit Selected button above the table.

If you want to modify all of the collectors displayed on all of the pages, click the Select All Pages

link above the collector table, and then click the Edit Selected button above the table.

When you edit a collector schedule, you can change the following schedule properties:

Next Scheduled Run – Specifies a start time for when the collector should run.

Repeat Interval – Specifies how often the collector should run on a recurring basis.

Spread Start Time – This checkbox can only be selected when more than one collector is being

edited. If you select this checkbox, the management server automatically adjusts the start time of

the selected collectors and spreads the load of the collectors across the specified repeat interval.

Advertising
This manual is related to the following products: