Performing the final steps, Initialization sequence, Initialize and calibrate mechanisms – HP NonStop G-Series User Manual

Page 65

Advertising
background image

Configuring and Testing the Tape Library

L700 (CTL700) Installation and User’s Guide 527338-008

5- 11

Performing the Final Steps

Performing the Final Steps

When the tape library and all tape drives are configured, perform these final steps
before testing the tape library:

1. Power off the tape library.

2. Open the right side door.

For CT9841FC-1 tape drives:

a. Insert the single connector end of the Y cable into all drives.

b. Install the client Fibre Channel cables.

c.

Check that all tape drive power switches are in the ON (1) position.

3. Power on the tape library. An initialization sequence (described next) begins.

Initialization Sequence

An IPL occurs when the tape library powers on or the RESET button is pressed. The
IPL process consists of functional firmware loading.

The MPC card directs the initialization process, which consists of the following:

Initialization and calibration of robotic mechanisms

Calibration of the vision system

Motion testing

Hand assembly testing

An audit of tape cartridges within the tape library

Audit of reserved cells

These steps are explained in the next sections.

Initialize and Calibrate Mechanisms

Robotic mechanism parameters are loaded into processor memory and calibration
routines are executed. The initialization process requires a maximum of five minutes.
Monitored in this sequence are:

Reach save position. The reach mechanism fully retracts, and the reach save
sensor must be detected before any theta or Z motion is initiated. This prevents
possible damage to the hard assembly or to a tape cartridge.

Z motor calibration. The Z mechanism moves from the end-stop to end-stop. The
distance and time for this motion is compared against the mechanism parameters
within the firmware.

Advertising
This manual is related to the following products: