Mezzanine card option – HP ProLiant BL495c G6 Server-Blade User Manual

Page 28

Advertising
background image

13.

Install the heatsink. Insert both screws, and then alternate tightening until the heatsink is seated

properly.

14.

Install the access panel (on page

13

).

15.

Install the server blade ("

Installing a server blade

" on page

17

).

Mezzanine card option

Optional mezzanine cards are classified as Type I mezzanine cards and Type II mezzanine cards. The

card type determines where it can be installed in the server blade.

Install Type I mezzanine cards on either mezzanine 1 connector or mezzanine 2 connector.

Install Type II mezzanine cards only on mezzanine 2 connector.

Optional mezzanine cards enable network connectivity and provide Fibre Channel support. For
mezzanine card locations, see the system board components (on page

8

).

For mezzanine card signal mapping, see the HP ProLiant BL495c G6 Server Blade Installation Instructions

that ship with this server blade.
To install the component:

1.

Power down the server blade (on page

11

).

2.

Remove the server blade (on page

12

).

3.

Remove the access panel (on page

12

).

Hardware options installation 28

Advertising