Secondary pci riser cage option – HP ProLiant DL380p Gen8 Server User Manual

Page 74

Advertising
background image

Hardware options installation 74

5.

Release the full-length expansion board retainer, and then remove the PCI riser cage.

6.

Remove the expansion slot cover ("

Removing the expansion slot blanks

" on page

72

).

7.

Install the expansion board.

8.

Connect any required internal or external cables to the expansion board. See the documentation that
ships with the expansion board.

9.

Install the PCI riser cage (on page

30

).

10.

Secure the full-length expansion board retainer (on page

31

) if any full-length expansion boards are

installed.

11.

Install the access panel (on page

25

).

12.

Install the server into the rack ("

Installing the server into the rack

" on page

38

).

13.

Connect each power cord to the server.

14.

Connect each power cord to the power source.

15.

Power up the server (on page

23

).

Secondary PCI riser cage option

WARNING:

To reduce the risk of personal injury, electric shock, or damage to the equipment,

remove the power cord to remove power from the server. The front panel Power On/Standby

button does not completely shut off system power. Portions of the power supply and some internal
circuitry remain active until AC power is removed.

CAUTION:

To prevent improper cooling and thermal damage, do not operate the server unless

all PCI slots have either an expansion slot cover or an expansion board installed.

IMPORTANT:

The secondary PCI riser cage option requires both processors.

To install the component:

1.

Power down the server (on page

23

).

Advertising