Warning, Installation instructions, Leveling and stabilizing your dryer – GE GTDP740EDWW User Manual

Page 7: Alcove or closet installation

Advertising
background image

Installation Instructions



4 LEVELING LEGS

LEVELING AND STABILIZING YOUR DRYER

the 4 leveling legs, at the corners, to ensure that the dryer
is level from side to side and front to rear.

5

LEVEL
SIDE-TO-SIDE

OPEN
DOOR 90

O

LEVEL
FRONT-TO-BACK

4 LEVELING LEGS

6

ALCOVE OR CLOSET INSTALLATION

>If your dryer is approved for installation in an alcove or closet, it will

be stated on a label on the dryer back.

>The dryer MUST be vented to the outdoors. See the EXHAUST

INFORMATION sections 3 & 4.

>Minimum clearance between dryer cabinet and adjacent walls or

other surfaces is:

0 in. either side

52 in. from floor to overhead cabinets.

3 in. front
3 in. rear

>

ceiling, etc. is 52 in.

> Closet ventilation openings required: 2 louvers each 60 square in.

(387 square cm), located 3 inches (7.6 cm) from top and bottom
of door. If the closet contains both a washer and a dryer, doors
must contain a minimum of 120 sq. in. of open area equally
distributed.

Before the “Alcove or Closet
installation”.

>

Keep flammable materials and vapors,

such as gasoline, away from dryer.

>

Failure to do so can result in death,

explosion, or fire.

Explosion Hazard

>

Consideration must be given to provide adequate clearance for

installation and service

WARNING

Advertising
This manual is related to the following products: