Using duct cover accessories – GE ZV36SSFSS User Manual

Page 3

Advertising
background image

zv36SSfSS – GE Monogram 36" Stainless Steel Professional Hood

For answers to your Monogram,

®

GE Profile

or

GE appliance questions, visit our website at

GEAppliances.com or call

GE Answer Center

®

service, 800.626.2000.

Listed by

Underwriters

Laboratories

using Duct Cover Accessories

To avoid unsightly gaps, plan the hood installation height for duct covers

use. Use the following formula to calculate the need for one of more

duct covers and to ensure a trouble free installation.

We recommend that the vent hood and decorative duct cover (if used) be

on site before final framing and wall finishing. This will help to

accurately locate studs, ductwork and electrical service.
• Read these examples carefully to determine the need for one or more

6" or 12" duct covers.

A = Countertop to ceiling height.

B = Gap at the top of the hood to the ceiling.

C = Hood installation height – Plus 18" hood height.

NOTE: Dia. C should be between 48" and 54" (for a 30" to 36" installation

height). Raise or lower the hood installation height to allow use of one

or more 6" and 12" duct covers.

A - B = C

Ceiling Height

A

C

B

18" Hood

Height

INSTALLATION EXAMPLES

8 ft. Ceiling

12"

30"

9 ft. Ceiling

24"

30"

10 ft. Ceiling

30"

36"

8 ft. ceilings: When the hood is installed 30"

above the cooking surface and there is no

soffit or upper cabinetry, order one 12" duct

cover accessory.

9 ft. ceilings: When the hood is installed 30"

above the cooking surface, order two 12" duct

cover accessories.

10 ft. ceilings: When the hood is installed 36"

above the cooking surface, order three 12" and

one 6" duct cover accessories.

Specification Revised 6/11

130644

Advertising