Installation instructions, Important, 1 install framing for hood support – GE ZV800SJSS User Manual

Page 9: Ductwork, wiring locations

Advertising
background image

9

1 INSTALL FRAMING FOR HOOD

SUPPORT

IMPORTANT

³

Framing must be capable of

supporting 100 lbs.

If drywall is present, mark the screw hole locations for

the top mounting brackets. Remove the template.
‡ Cut away enough drywall to expose 2 vertical studs

at the bracket location indicated on the template.

‡ Install a horizontal support at least 1” x 6” between

two wall studs at the top bracket installation

location. The horizontal support must be flush with

the room side of the studs. Use cleats behind both

sides of the support to secure to wall studs.

‡ Reinstall drywall.

Centerline of

Installation

Space

8" Min. Opening for Ductwork

View From Rear

Cleats

1" x 6" Min.

Mounting

Support

Installation Instructions

6” min. opening for ductwork

Centerline of

installation

space

View from rear

cleats

1” x 6” min.

mounting

support

DUCTWORK, WIRING LOCATIONS

Determine the exact location of the vent hood.

‡ Locate the template packed with the literature.

– Measure 36” from the floor to the top of the cooking

surface. Add hood installation height determined on

page 7. Mark that location.

– Use a level to draw a straight pencil line on the wall.

– Tape the template in position along the penciled line.

CHECK TO BE SURE THE TEMPLATE IS LEVEL.

Ceiling ducting:
If ductwork will vent straight up to the ceiling:

‡ Use a level to draw a line straight up, from the

centerline on the template to the ceiling.

‡ Measure 3-3/4” from the back wall to the centerline of

a 6-1/2” hole on the ceiling.

NOTE: If drywall is not present, add drywall thickness to

the 3-3/4” dimension.

Wall Ducting:
If ductwork will vent to the rear:

‡ Use a level to draw a line straight up from the

centerline on the template.

‡ Measure at least 3-3/4” above the top mounting

bracket holes shown on the template to the centerline

of a

6-1/2” dia. duct hole. (Hole may be elongated for duct

elbow.)

HOUSE WIRING LOCATION:

‡ The junction box is located on the top right side of the

hood.

‡ Wiring should enter the back wall 20” to 26” above

the bottom of the hood, and within 4” of the right side

of the centerline. Wiring should enter at least 4” above

the bracket on the right side.

:$//02817(',167$//$7,21³9(17('727+(2876,'(

REAR WALL TEMPLATE

CL

49-80271 JR 07-04

Drill 1/8"

Pilot Holes

Drill 1/8"

Pilot Holes

Drill 1/8"

Pilot Holes

Drill 1/8"

Pilot Holes

Drill 1/8"

Pilot Holes

Drill 1/8"

Pilot Holes

ALIGN BOTTOM EDGE WITH

PENCIL LINE INDICATING

BOTTOM OF THE HOOD.

5-1/16"

9-5/8"

8-1/8"

2-1/16"

13-3/4"

12-3/4"

Ceiling

3-3/4” c enterline to wall

6-1/2” dia. hole

for ceiling vent ducting

Centerline 3-3/4”

min. above

top mounting
bracket holes

FOR WALL VENT DUCT

Advertising