Orque, Pecifications, Ubrication – Ashland I-110TS User Manual
Page 26
Advertising

T
ORQUE
S
PECIFICATIONS
L
UBRICATION
1. Grease all zerks every 8 hrs of operation with high quality, general-purpose grease.
a)
Grease until grease flows from around pin.
Lubrication Points (see Ill. on next page)
1. Hitch – Horizontal and vertical pins.
2. Lift Cylinders – Rod end &Trunion; Both left & right sides.
3. Front Arm Pivot Joint – Both left & right sides.
4. Apron Cylinders – Rod clevis pin; Both left & right sides.
5. Apron Pivot Pin – Both left & right sides.
6. Hold-down Rollers – Both left & right sides.
7. Floor Rollers – Both left & right sides.
8. Tapered Rollers – Both left & right sides.
Advertising