I-155 xl2 torque specifications – Ashland I-155XL2 Ver 7-2008 User Manual

Page 18

Advertising
background image

I-155 XL2
Torque Specifications

TORQUE

SPECIFICATIONS























LUBRICATION



1. Grease all zerks every 8 hrs of operation with high quality, general-purpose grease.

a)

Grease until grease flows from around pin.

Lubrication Points (see Ill.)

1. Hitch – Horizontal and vertical pins.
2. Lift Cylinders – Rod end &Trunion; Both left & right sides.
3. Front Arm Pivot Joint – Both left & right sides.
4. Apron Cylinders – Rod clevis pin; Both left & right sides.
5. Apron Pivot Pin – Both left & right sides.
6. Hold-down Rollers – Both left & right sides.
7. Floor Rollers – Both left & right sides.
8. Tapered Rollers – Both left & right sides.

Bolt Torque

Diameter Ft-lbs

1/4 12

5/16” 25

3/8” 45

7/16” 70

½” 110

9/16” 150

5/8” 220

¾” 380

7/8” 600

1” 900

1-1/8” 1280

Lug Nuts

750

Ashland Industries

Troll-free:877-634-4622 Fax:715-682-9717

Page #17

Advertising