Manley STEELHEAD RC User Manual

Page 9

Advertising
background image

OPERATIONAL NOTES

PREPARATION FOR INSTALLATION

Budget a suitable space in which to place the preamplifier, power supply and associated in-

terconnect cable. This space should be free of strong external magnetic and RF fields, and reason-

ably removed from strong loudspeaker-generated acoustical fields. This space should also be free

of excessive heat or dust and large enough to permit easy flow of cool air to the top, bottom and

sides of the preamp and power supply.

Make sure the power supply’s mains voltage selector switch is set to match the local line

voltage, and the wire link is present between the preamp’s green CHASSIS and black CIRCUIT

ground mini binding posts on the rear panel.

Try to position the power supply away from any interconnect cables which may be carrying

audio signals.

BEFORE POWER-UP

Once placed, join the power supply cable to the pre-amplifier via the large16-pin circular

connector. The 16-pin connectors are keyed and can only be mated when both halves are lined

up correctly. Check and make sure the power supply is switched off, then attach the grounded

IEC power cable jack to the IEC plug. Keep the power off until all other system connections are

completed.

Proceed by connecting the input and output cabling to the signal sources and loads as de-

sired. Tie any separate turntable or tonearm ground lead to the gold CHASSIS ground binding

Set the GAIN dB control to 55 dB and VOLUME control to about 9 o’clock. Choose the

MM or an MC input, as necessary, with the INPUT control. Place the LOAD Z switch to a value

at or near that recommended by the cartridge manufacturer. Adjust the LOAD CAP switches to

a value at or near that recommended by the cartridge manufacturer less any interconnect cable

capacitance. Select and clean, if necessary, your favorite gramophone record....

Plug the power cable in and place the power supply’s mains power switch in the on (|) po-

sition. The SLEEP switch should glow. Push the SLEEP switch. The SLEEP switch will go dark,

selected INPUT and GAIN blue LED’s will illuminate, the MUTE switch lamp will start flash-

ing and the power supply pilot LED and the MANLEY STEELHEAD RC badge will light up.

The winking MUTE lamp indicates the beginning of a 30 second warm-up mute delay,

during which time the muting relay is engaged; no output will be heard from the preamp.

9

Advertising