to the rear differential housing using the stock bolt. 
Special Note: Make sure to use thread locker or lock 
tite. Next, attach the stock brake line bracket to the 
newly installed brake line bracket and secure using the 
new 5/16” x 1” bolt and hardware. Torque to 16 ft. lbs. 
See Illustration # 7
24. Position a pair of hydraulic floor jacks under the rear 
axle. Place one jack stand on the driver side and one on 
the passenger side. Raise up on both hydraulic floor 
jacks at the same time until they make contact with the 
rear axle. 
 
25. Working on the driver side, remove the stock shock 
and save the stock hardware for later re-installation. 
Special Note: New longer rear shocks are needed, if 
you have not already ordered shocks, please contact 
Tuff Country or your local Tuff Country dealer and 
order the proper shocks. Tuff Country recommends 
using a 26” fully extended nitrogen gas shock when 
installing a 2” or 3” suspension system and a 30” 
fully extended nitrogen gas shock when installing a 
4” suspension system. Repeat procedure on the 
passenger side. 
 
26. Working on the driver side, remove the (2) stock rear 
U-bolts and discard. Set the upper U-bolt plate a side for 
later re-installation. Repeat procedure on passenger side 
 
27. Lower down on both hydraulic floor jacks at the same 
time until the stock springs separate from the stock rear 
axle. Lower down approximately 5”. Special Note: Make 
sure not to over extended any brake lines or hoses 
when lowering the axle. This will allow you enough 
room for the new rear springs to be installed. 
 
28. Working on the driver side. Remove the stock spring 
from the stock location. The stock spring and stock 
spring eye hardware may be discarded. Repeat 
procedure on the passenger side. 
 
29. Locate the new rear springs and the new rear spring 
eye hardware. Working on the driver side, install the new 
rear spring into the stock location and secure using the 
new spring eye hardware. Make sure to use thread 
locker or locktite on these bolts. Torque the rear 
spring eye hanger hardware to 120 ft lbs. Special Note: 
Do not torque the rear spring eye shackle hardware 
at this time. Once the vehicle is lowered to the 
ground, the rear spring eye shackle will be torque to 
40 ft lbs. Repeat procedure on the passenger side. 
Special Note: The new rear springs have an off set 
centering bolt, the longer end of the spring needs to 
be installed towards the rear of the vehicle. 
 
30. Carefully raise up on both hydraulic floor jacks at the 
same time until the newly installed rear springs seat 
properly to the stock rear spring perches. 
 
31. Locate (2) new 5/8” x 3” x 7 5/8” Round U-bolts, (4)
5/8” U-bolt High Nuts and (4) 5/8” U-bolt Washers. 
Working on the driver side, install (2) new 5/8” x 3” x 7 
5/8” round U-bolts into the stock location and secure 
using the new 5/8” high nuts and washers. Torque to 
130 ft lbs. Repeat procedure on passenger side. 
Special Note: With a suitable cutting tool, cut off the 
excess U-bolt threads on all (4) rear U-bolts. 
See Illustration # 8
32. Working on the driver side, install the new rear 
shocks absorbers using the stock hardware removed 
from step # 25. Special Note: New longer rear shocks 
are needed, if you have not already ordered shocks, 
please contact Tuff Country or your local Tuff 
Country dealer and order the proper shocks. Tuff 
Country recommends using a 26” fully extended 
nitrogen gas shock when installing a 2” or 3” 
suspension system and a 30” fully extended 
nitrogen gas shock when installing a 4” suspension 
system. Repeat procedure on the passenger side. 
See Illustration # 8
 
33. Check and double check to make sure that all step 
related with the front and rear end were performed 
properly. Check and double check to make sure that all 
stock and new hardware is torque to proper torque 
specifications. Use the torque sheet at the beginning of 
the installation manual. 
 
34. Install the tires and wheels and safely lower the 
vehicle to the ground. 
 
35. With the weight of the vehicle on the ground, torque 
the top and bottom spring eye shackle bolts on the driver 
and passenger side to 40 ft lbs.  
 
36. Once the installation is complete, make sure to bleed 
the brake lines. Also, using the proper brake fluid, make 
sure to top off the brake fluid level. 
 
CONGRATULATIONS INSTALLATION
COMPLETE
Special Note: After the completion of the
installation, Tuff Country EZ-Ride
Suspension recommends taking the vehicle
to an alignment shop and having a proper
front end alignment performed.
It is also a good idea to keep a close watch
on the front and rear drive line U-joints. If
they start to wear out, make sure to replace
them.