41. Check and double check to make sure that all step 
related with the front and rear end were performed 
properly. Check and double check to make sure that all 
stock and new hardware is torque to proper torque 
specifications. Use the torque sheet at the beginning of 
the installation manual. 
 
42. Install the tires and wheels and safely lower the 
vehicle to the ground. 
 
43. Once the installation is complete, make sure to bleed 
the brake lines. Also, using the proper brake fluid, make 
sure to top off the brake fluid level. 
 
CONGRATULATIONS INSTALLATION
Special Note: After the completion of the
installation, Tuff Country EZ-Ride
Suspension recommends taking the vehicle
to an alignment shop and having a proper
front end alignment performed.
It is also a good idea to keep a close watch
on the front and rear drive line U-joints. If
they start to wear out, make sure to replace
them.
If you have any questions or concerns,
please feel free to contact Tuff Country or
your local Tuff Country dealer.
Torque Settings
5/16”
15—18
ft
lbs.
3/8”
28—32 ft lbs.
7/16”
30—35
ft
lbs.
1/2”
65—85 ft lbs.
9/16”
85—120
ft
lbs.
5/8”
95—130
ft
lbs.
3/4”
100—140
ft
lbs.
the small end of the new block needs to be installed 
with the small end towards the front of the vehicle. 
Repeat procedure on passenger side.
See Illustration # 9
33. Raise up on both hydraulic floor jacks at the same 
time until the driver and passenger side stock spring 
assembly seats flush with newly installed 5.5” block. 
 
34. Locate (4) new 5/8” x 2 3/4” x 14 1/2” square U-bolts, 
(8) 5/8” U-bolt high nuts, (8) 5/8” U-bolt washers and the 
stock upper U-bolt plates that were removed from step # 
28. Working on the driver side, install (2) new 5/8” x 2 
3/4” x 14 1/2” square U-bolts into the stock location and 
secure using the new 5/8” high nuts and washers. 
Torque to 130 ft lbs. Repeat procedure on passenger 
side. Special Note: With a suitable cutting tool, cut 
off the excess U-bolt threads on all (4) rear U-bolts. 
See Illustration # 9
35. Working on the driver side, install the new rear 
shocks absorbers using the stock hardware removed 
from step # 27. Special Note: Shocks are not included 
with this suspension system, shocks need to be 
ordered as a separate part number, Tuff Country EZ-
Ride Suspension recommends using a 30” fully 
extended nitrogen gas shocks. Repeat procedure on 
passenger side.
See Illustration # 9
36. Place a pair of hydraulic floor jacks under the stock 
transfer case cross member. Place one hydraulic floor 
jack on the driver side and one on the passenger side. 
Carefully raise up on both hydraulic floor jacks at the 
same time until they come into contact with the stock 
transfer case cross member. 
 
37. Working on the driver side, remove the stock 
hardware that connects the stock transfer case cross 
member to the stock frame rail. The stock hardware may 
be discarded. Repeat procedure on the passenger side. 
 
38. Carefully lower down on both hydraulic floor jacks at 
the same time approximately 2”. This will allow enough 
room for the new transfer case drop kit to be installed. 
 
39. Locate (2) transfer case drop tubes, (4) 7/16” x 3” 
bolts, (4) 7/16” flat washers and (2) 7/16” unitorque nuts. 
Working on the driver side, install the new transfer case 
drop tube between the stock transfer case cross member 
and the stock frame rail. Secure using the new 7/16” x 
3” bolts and hardware. Torque to 35 ft lbs. Special 
Note: The transfer case drop tubes are the tubes that 
measure 1 1/2” tall. Repeat procedure on the 
passenger side.
See Illustration # 10
40. Carefully remove both hydraulic floor jacks from 
under the transfer case cross member.