Functional test – Outback Power Systems GFX International Series Installation Manual User Manual

Page 35

Advertising
background image

Installation

900-0111-01-00 Rev B

33

Functional Test

Once the mounting, wiring, and other installation steps are completed, proceed to the International
Series GFX Operator’s Manual
. The Operator’s Manual has steps for powering up and performing a
functional test on the inverter system, as well as powering down and adding new devices to an
existing system.

Refer to the system display manual for programming instructions and menus.

Advertising