Functional test, Installation – Outback Power Systems GS8048 Installation Manual User Manual

Page 40

Advertising
background image

Installation

38

900-0021-01-00 Rev B

Functional Test

Once the mounting, wiring, and other installation steps are completed, proceed to the Radian Series

Inverter/Charger Operator’s Manual. The Operator’s Manual has steps for system commissioning. These

include powering up and performing a functional test on the inverter system, as well as powering
down and adding new devices to an existing system.
Refer to the MATE3 Owner’s Manual for programming instructions and menus.


Advertising