Greasing, L/r grease locations, Fig. 20a fig. 20b – Ag Spray Equipment 6500 Series Sprayer User Manual
Page 13

A G S P R A Y . C O M 1 2
GREASING
- Wipe grease fitting with a clean cloth before greasing
to prevent injecting dirt and frit into joint.
- Replace and repair broken fittings immediately.
- If a fitting will not take grease, remove and clean
thoroughly. Also clean lubricant passageway.
Replace fitting if necessary.
*Note: Grease 18 points 8 hours or daily.
L/R GREASE LOCATIONS
1. L/R Breakaway Hinge
2. L/R Outer Boom Hinge
3. L/R Inner Boom Hinge
4. L/R Center Section Bushing (Lower)
5. L/R Center Section Bushing (Upper)
6. Parallel Hinge Bushings (Total of 8)
(4 Top Pins & 4 Bottom Pins)
Apply adequate grease to the following:
FIG. 20a
FIG. 20b
3. Follow good shop practices:
- Keep service area clean and dry
- Be sure electrical outlets and tools are properly
grounded
- Use adequate light for the job at hand.
4. Before applying pressure to a hydraulic system, make
sure all components are tight and that steel lines,
hoses and coupling are in good condition.
5. Before applying pressure to chemical system, make
sure that all connection are tight and that all hoses
and fittings are in good condition.
6. Relieve pressure from hydraulic circuit before
servicing or disconnecting from tractor.
7. Keep hands, feet, clothing and hair away from all
moving and/or rotating parts.
8. Clear the area of bystanders, especially children,
when carrying out any maintenance and repairs or
making any adjustments or filling.
9. Place stands or blocks under the frame before
working beneath the machine.
10. Wear safety goggles, neoprene gloves and protective
clothing when working on the sprayer filled with active
chemical.
11. Wash machine to remove all chemical residue before
working on unit. Wear appropriate protective gear at
all times.
12. Protect yourself from chemical contamination.