Operating and installation instructions

SAFE, SAFE-P, SAFE-TC, SAFE-TCP/TCS

- Planners / construction companies or operators are responsible for positioning and

installing products.

- The valves are designed for application, not influenced from weather.
- For application outside or in adverse environments like corrosion-promoting conditions

(sea water, chemical vapours, etc.), special constructions or protective measures are
recommended.

- Refer to appropriate TRD 421, AD2000-A2, DIN, ASME Code rules for piping and

installation.

- Remove transport fasteners and protective caps for inlet and outlet immediately before

installation.

- Water shall be drained from the safety valve and blow-off line via the blow-off line

(drainage points always at the lowest point).

fig. 5

- Flange gaskets shall be fitted concentrically and not restrict the flow cross

section.

- Keep the shaft of the spindle-unit free from paint (open bonnet / cap).
- Blow-off lines shall be laid with gradient.
- The ratio pao/po shall be taken into account when dimensioning the system.
- Safety valves shall be equipped with support tongues to absorb high reaction

forces.

- Pressure losses in the line to the safety valve shall not exceed 3%.
- Ensure that adequate drip pans are used if setting media in Fluid Group

pursuant to PED 97/23/EC.

Support

Drip pan

Drainage

Bellow

Drainage at lowest point