Operating and installation instructions

ARI-REYCO R / RL Series

- Planners / construction companies or operators are responsible for positioning and

installing products.

- The valves are designed for application, not influenced from weather.
- For application outside or in adverse environments like corrosion-promoting conditions

(sea water, chemical vapours, etc.), special constructions or protective measures are
recommended.

- Refer to appropriate ASME Code / API rules for piping and installation.
- Remove transport fasteners and protective caps for inlet and outlet immediately before

installation.

- Water shall be drained from the safety valve and blow-off line via the blow-off line

(drainage points always at the lowest point).

fig. 12

- The ratio pao/po shall be taken into account when dimensioning the system.
- Pressure losses in the line to the safety valve shall not exceed 3%.
- Ensure that adequate drip pans are used if setting media in Fluid Group

pursuant to PED 97/23/EC.

Support

Drip pan

Drainage

Bellow

Drainage at lowest point

Advertising