Maintenance, Travis industries, Door opening – Avalon Stoves Astoria PS User Manual

Page 29

Advertising
background image

Maintenance

2 9

© Travis Industries

4080725

1 0 0 - 0 1 1 5 4

Daily Maintenance (whenever using the stove) - Continued

Door Opening

WARNING

:

Make sure the
heater has fully
cooled
(approximately 25
minutes) before
opening the door
and conducting
service.

Phillips
Screwdriver

With the pawl free of the bracket,

the door may be swung open.

When securing

the door, make

sure the pawl fits

over the bracket

before tightening.

NOTE: Do not overtighten the pawl. This can

permanently damage the latch and

prematurely wear out the door gasket.

Door

Frame

Bracket (attached to side of

heater)

Pawl

Lock Nut

Advertising