Quickstart, 1 preparation for use, Preparation for use – Campbell Scientific OBS-3+ and OBS300 Suspended Solids and Turbidity Monitors User Manual
Page 12

OBS-3+ and OBS300 Suspended Solids and Turbidity Monitors
4. Quickstart
4.1 Preparation for Use
1. Bench test the sensor to ensure that it functions properly prior to making
field installations (see Section 7.1, Pre-Deployment Tests).
2.
Calibrate the sensor using suspended solids from the waters that will be
monitored (see Section 8,
Calibration
)
.
3. Refer to Section 7.2, Mounting Considerations, for siting and mounting
options.
4.2 Use SCWin to Program Datalogger and Generate Wiring
Diagram
Short Cut is an easy way to program your datalogger to measure the sensor and
assign datalogger wiring terminals. The following procedure shows using
Short Cut to program the OBS-3+/OBS300.
1. Install Short Cut by clicking on the install file icon. Get the install file
installations of LoggerNet, PC200W, PC400, or RTDAQ software.
2. The Short Cut installation should place a Short Cut icon on the desktop of
your computer. To open Short Cut, click on this icon.
2