Chapter 2, Installation, Chapte – Allied Telesis AT-GS950/10PS User Manual
Page 37
Advertising

37
Chapter 2
Installation
This chapter contains the following sections:
“Reviewing Safety Precautions” on page 38
“Selecting a Site for the Switch” on page 41
“Cable Specifications” on page 42
“Unpacking the Switch” on page 43
“Installing the Switch on a Desktop” on page 45
“Installing the Switch in an Equipment Rack” on page 46
“Installing the Switch on a Wall” on page 48
“Installing Optional SFP Transceivers” on page 51
“Cabling the Switch” on page 54
Advertising
This manual is related to the following products: