Figure 7: shipping package contents – Allied Telesis AT-GS924M User Manual
Page 38
Advertising

Chapter 2: Installation
38
Figure 7. Shipping Package Contents
Retaining clip
Management cable
Four rubber feet
One regional AC
power cord
One, two, or four SFP
slot dust covers
(pre-installed).
(for desktop installation)
Two equipment rack
brackets
(not included in AT-
GS908M package)
Four or six bracket screws
(not included in AT-
GS908M package)
AT-GS916M: 4 each
AT-GS924M: 6 each
AT-GS916M
brackets
AT-GS924M
brackets
(pre-installed)
Advertising