Chapter 3: Beginning the Installation
62
Installation Overview
Table 15 lists the installation procedures for a stack of 8100S Series
switches. The procedures should be performed in the order presented in
the table.
Table 15. Installation Procedures
Step
Procedure
1
“Reviewing Safety Precautions” on page 63
2
“Planning the Installation” on page 67
3
“Unpacking the Switch” on page 69
4
“Installing the Switches in an Equipment Rack” on
page 72
5
“Labeling the Switches” on page 77
6
“Verifying and Setting the Stack ID Numbers” on page 82
7
“Cabling the Stacking Ports” on page 87
8
“Powering on AC Switches” on page 92 or “Powering On
DC Switches” on page 97
9
“Verifying the Installation” on page 101
10
“Cabling the Twisted Pair and Fiber Optic Ports” on
page 104
11