Installation Overview
Table 8 lists the installation procedures for the AT-DC2552XS L2 Data
Center Switch. The procedures should be performed in the order
presented in the table.
Table 8. Installation Procedures
Step
Procedure
1
“Reviewing Safety Precautions” on page 35
2
“Planning the Installation” on page 39
3
“Unpacking the Switch” on page 40
4
“Installing the Switch on a Desktop” on page 44
OR
“Installing the Switch in an Equipment Rack” on page 45
5
“Installing Power Supply Module” on page 48
6
“Installing Fan Module” on page 52
7
“Installing SFP+ Transceivers and Cables” on page 56
8
“Installing QSFP+ Transceivers and Cables” on page 61
9
“Powering On the Switch” on page 66