Allied Telesis AT-x510DP-52GTX User Manual
Page 66

Chapter 4: Installing the Switch and its Power Supplies
66
5. While another person holds the switch in the equipment rack, secure it
using standard equipment rack screws (not provided), as shown in
Figure 28 for horizontal mounting and Figure 29 for vertical mounting.
Figure 28. Mounting the Switch Horizontally in an Equipment Rack
Figure 29. Mounting the Switch Vertically in an Equipment Rack
6. If required, repeat this procedure to install the remaining switches in
the stack.
7. Apply power to the switch or switches, as described in the following
procedures.
S2
/28
S1/27
26
25
CO
NS
OL
E
SFP
+
x510DP-52GTX
FDX
HDX
COL
1000
LIN
K
ACT
10/100
LIN
K
AC
T
3
5
1
7
9
11
13
15
17
19
21
23
4
6
8
10
12
2
16
18
20
14
22
24
27
29
25
31
33
35
37
39
41
43
45
47
28
30
32
34
36
26
40
42
44
38
46
48
2674
S2/52
S1/51
50
49
CONSOLE
x510DP-52GTX
SFP+
FDX
HDX COL
1000 LINK
AC
T
10/100 LINK
AC
T
35
17
9
1
1
1
3
1
5
1
7
1
9
2
1
2
3
4
6
8
10
12
2
16
18
20
14
22
24
27
29
25
31
33
35
37
39
41
43
45
47
28
30
32
34
36
26
40
42
44
38
46
48