Figure 15: inserting the sfp – Allied Telesis AT-FS750/24POE User Manual
Page 47
Advertising

AT-FS750/24POE Fast Ethernet WebSmart Switch Installation Guide
47
4. Slide the SFP transceiver into an SFP slot on the switch, as shown in
Figure 15. Inserting the SFP
5. Repeat steps 2 through 4 if you are installing a second SFP
transceiver.
Note
SFP transceivers are dust sensitive. When a fiber optic cable is not
installed, or when you store the SFP, always keep the plug in the
optical bores. When you do remove the plug, keep it for future use.
Refer to “Cleaning Fiber Optic Connectors” on page 59 if fiber
connections require cleaning
Note
Unnecessary removal and insertion of an SFP transceiver can lead
to premature failure.
For information about cabling for the SFP, consult the documentation
that was shipped with the SFP.
1723
Advertising