Verifying the installation – Allied Telesis AT-MCF2000M User Manual
Page 55
Advertising

AT-MCF2000M Management Module Installation Guide
55
Verifying the Installation
This procedure verifies the installation of the
AT-MCF2000M Management Module. The procedure
assumes the chassis with the module is powered on.
To verify the installation of the module, perform the
following procedure:
1.
Verify that the Power LED on the module is green.
2.
If you connected a network cable to the 10/100/
1000Base-T Management Module, verify that the L/A
(Link/Activity) LED is green or amber.
3.
If you connected a cable to the Stack port, the Link/
Activity LED for the port should be steady or flashing
green.
Note
If there are any problems, refer to Chapter 3,
“Troubleshooting” on page 63 for assistance.
Advertising