Chapter 2: Installing the Hardware

38

Installation Overview

This section lists the procedures for building a stack of the AT-9424Ts,
AT-9424Ts/XP, and AT-9448Ts/XP Switches. The installation procedures
are divided into three chapters and should be performed in the order
presented in Table 7. Allied Telesis recommends printing this table and
placing a check mark beside the procedures as you complete them.

Table 7. Installation Procedures for a Stack

Step

Procedure

Chapter 2, “Installing the Hardware”

1

“Reviewing Safety Precautions” on page 40

2

“Planning the Installation of a Stack” on page 42

3

“Maximum Number of Switches in a Stack” on page 43

4

“Unpacking a Switch” on page 44

5

“Installing the AT-StackXG Stacking Module” on page 45

6

“Installing the Power Cord Retaining Clip (AC Switches
Only)” on page 48

7

“Installing the Switches in an Equipment Rack” on
page 49

Chapter 3, “Preparing the Switches of the Stack”

8

“Verifying the AT-S63 Version Number” on page 52

9

“Choosing Static or Dynamic Module ID Numbers” on
page 55

10

“Labelling the Switches” on page 56

11

“Assigning the Static Module ID Number 1 to the Master
Switch” on page 58

12

“Assigning a Static Module ID Number to the Member
Switches” on page 61

13

“Cabling the AT-StackXG Stacking Modules” on page 62

14

“Powering On the Switches of the Stack” on page 65

15

“Verifying the Installation” on page 67

16

“Troubleshooting the Discovery Process” on page 71