Chapter 2, Installation, R 2: installation – Allied Telesis AT-GS900/8E User Manual
Page 27
Advertising

27
Chapter 2
Installation
This chapter contains the following sections:
“Reviewing Safety Precautions” on page 28
“Selecting a Site for the Switch” on page 30
“Unpacking the Switch” on page 32
“Using a Switch on a Desktop” on page 34
“Installing the Power Cord Retaining Clip on the AT-GS900/8L Switch”
on page 35
“Mounting a Switch on the Wall” on page 37
“Installing a Switch in a Rack” on page 39
“Wiring the Switch” on page 41
“Powering On a Switch” on page 42
Advertising
This manual is related to the following products: