Selecting a site, Installing the switch – Allied Telesis AT-9800 Series Switch User Manual

Page 4

Advertising
background image

4

AT-9800 Series

C613-04038-01 REV F

Selecting a Site

The switch can be installed in a standard 19-inch rack or on a level surface such
as a desktop or bench. When installing the switch, choose a site that:

■

Allows adequate airflow around the switch and its vents

■

Is free of dust and moisture

■

Will maintain an ambient temperature range of 0 - 40º C (32 - 104º F) and a
humidity range of 5 - 95% non-condensing.

■

Has a reliable and earthed (grounded) power supply circuit, preferably
dedicated and filtered.

■

Does not expose cabling to sources of electrical noise, such as radio
transmitters, broadband amplifiers, power lines, electric motors, and
fluorescent fixtures

■

Allows easy access to the switch’s power and cable connections

■

Will allow all related network devices to be connected to the switch
without exceeding maximum cable length limitations. See the AT-9800
Series Hardware Reference
for cable length specifications

Installing the Switch

This equipment must be earthed.

Follow these steps to install the switch:

1.

Read the safety information

For safety information, see the Safety and Statutory Information booklet. A
copy of this booklet is supplied with each switch, and can also be found on
the Documentation and Tools CD-ROM or at www.alliedtelesyn.co.nz/
support/at9800/.

2.

Gather the tools and equipment you will need

If installing a DC version of the switch, you will need a DC power source,
DC supply cable, and ring connectors (see step 8).

If the switch is to be connected to a redundant power supply, you will need
a redundant power supply unit and cable (see step 10).

3.

Choose a suitable site for the switch

Either a flat surface or 19 inch rack.

4.

Unpack the switch

Verify the package contents. If any items are damaged or missing, contact
your sales representative.

Advertising