Certification, Connector pinouts for utp and uplink port, Table 6: hub to nic pin assignments – Allied Telesis AT-MR840TF User Manual
Page 40: Mdi/mdix switch must be set to mdix for utp, Table 7: hub to hub pin assignments, Mdi/mdi-x switch must be set to mdi for fiber, Mdi/mdi-x switch must be set to mdi-x

Technical Specifications
20
Certification
Safety
CE Compliant
UL 1950, CSA 22.2 No. 950, TUV EN60950,
EN 60825
Emission EMI/RFI
FCC Class A, EN55022 Class A,
Immunity
EN50082-1, IEC 801-2 1984 level 2 EFT/Burst
Immunity IEC 801-41 1988 level 2
Connector Pinouts for UTP and Uplink Port
Table 6 shows the pinouts for straight through cable when connecting a hub to
a NIC. Table 7 shows the pinouts for straight through cable when connecting a
hub to a hub (cascading using Port 8). According to the 10Base-T specification,
pins 1 and 2 on the connector are used for transmitting data; pins 3 and 6 are
used for receiving data. The “+” and “-” signs represent the polarity of the two
wires that make up each wire pair.
Table 6: Hub to NIC Pin Assignments
Hub Side
Signal
Name
Pin No.
Signal
Direction
Signal
Name
MDI/MDI-X switch must be
set to MDI-X for UTP
RX+
1
<-----------
TX+
RX-
2
<-----------
TX-
TX+
3
----------->
RX+
TX-
6
----------->
RX-
Table 7: Hub to Hub Pin Assignments
Hub Side
Signal
Name
Pin No.
Signal
Direction
Signal
Name
Hub Side
MDI/MDI-X
switch must be
set to MDI for
fiber
TX+
1
----------->
RX+
MDI/MDI-X
switch must be
set to MDI-X
TX-
2
----------->
RX-
RX+
3
<-----------
TX+
RX-
6
<-----------
TX-
MR840TF_Book Page 20 Tuesday, November 11, 1997 3:46 PM