Certification, Connector pinouts for utp and uplink port, Table 6: hub to nic pin assignments – Allied Telesis AT-MR840TF User Manual

Page 40: Mdi/mdix switch must be set to mdix for utp, Table 7: hub to hub pin assignments, Mdi/mdi-x switch must be set to mdi for fiber, Mdi/mdi-x switch must be set to mdi-x

Advertising
background image

Technical Specifications

20

Certification

Safety

CE Compliant
UL 1950, CSA 22.2 No. 950, TUV EN60950,
EN 60825

Emission EMI/RFI

FCC Class A, EN55022 Class A,

Immunity

EN50082-1, IEC 801-2 1984 level 2 EFT/Burst
Immunity IEC 801-41 1988 level 2

Connector Pinouts for UTP and Uplink Port

Table 6 shows the pinouts for straight through cable when connecting a hub to
a NIC. Table 7 shows the pinouts for straight through cable when connecting a
hub to a hub (cascading using Port 8). According to the 10Base-T specification,
pins 1 and 2 on the connector are used for transmitting data; pins 3 and 6 are
used for receiving data. The “+” and “-” signs represent the polarity of the two
wires that make up each wire pair.

Table 6: Hub to NIC Pin Assignments

Hub Side

Signal

Name

Pin No.

Signal

Direction

Signal

Name

MDI/MDI-X switch must be

set to MDI-X for UTP

RX+

1

<-----------

TX+

RX-

2

<-----------

TX-

TX+

3

----------->

RX+

TX-

6

----------->

RX-

Table 7: Hub to Hub Pin Assignments

Hub Side

Signal

Name

Pin No.

Signal

Direction

Signal

Name

Hub Side

MDI/MDI-X

switch must be

set to MDI for

fiber

TX+

1

----------->

RX+

MDI/MDI-X

switch must be

set to MDI-X

TX-

2

----------->

RX-

RX+

3

<-----------

TX+

RX-

6

<-----------

TX-

MR840TF_Book Page 20 Tuesday, November 11, 1997 3:46 PM

Advertising